TOTAL AFTER TRANSMISSION / 350 LIGHTNING RODS MADE / 1,120 IRON BARS MADE / 071/400 PLACED
NO MOVING-IMAGE RECORD EXISTS
On September 3, 2026, the preparation system reported READY and the operator pressed Start Streaming. OBS created neither a local recording nor an outbound stream, and YouTube never became live. The failure was discovered only when the session ended.
The surviving world state and telemetry confirm that the field advanced from 58 to 71 completed poles. Thirteen poles—059 through 071—were erected. The final session snapshot records 1,950 blocks travelled, 182 blocks broken, zero deaths, zero natural-lightning events, and 176 iron bars crafted during the interval.
The measured interval from the armed-broadcast marker to the final world snapshot is 4 hours, 46 minutes, and 36 seconds. Telemetry and four surviving screenshots document outcomes, but they do not reproduce the player’s first-person actions, camera movement, sound, or experience.
No reconstruction is presented as the original Transmission 020 recording. This entry preserves both the completed labor and the failure of its video documentation.